European Union flag

The PKW system at the EDF Goulours dam in France

The Piano Key Weir (PKW) system, developed by France's Hydro Engineering Centre, safeguards hydropower infrastructure from climate change-induced floods in 10 local dams and globally in 30 installations. PKW adapts dam capacity efficiently with increased water discharge, offering a cost-effective, reliable, and collaborative solution. Author and source: Frederic Laugier, EDF. Case study: https://climate-adapt.eea.europa.eu/en/metadata/case-studies/fd

The PKW system at the EDF Goulours dam in France
Size: 66.1 kB  —  Click to download full sized image
Language preference detected

Do you want to see the page translated into ?

Exclusion of liability
This translation is generated by eTranslation, a machine translation tool provided by the European Commission.

Exclusion of liability
This translation is generated by eTranslation, a machine translation tool provided by the European Commission.