All official European Union website addresses are in the europa.eu domain.
See all EU institutions and bodiesThe PKW system at the EDF Goulours dam in France
The Piano Key Weir (PKW) system, developed by France's Hydro Engineering Centre, safeguards hydropower infrastructure from climate change-induced floods in 10 local dams and globally in 30 installations. PKW adapts dam capacity efficiently with increased water discharge, offering a cost-effective, reliable, and collaborative solution. Author and source: Frederic Laugier, EDF. Case study: https://climate-adapt.eea.europa.eu/en/metadata/case-studies/fd

Language preference detected
Do you want to see the page translated into ?
Exclusion of liability
This translation is generated by eTranslation, a machine translation tool provided by the European Commission.
Exclusion of liability
This translation is generated by eTranslation, a machine translation tool provided by the European Commission.