European Union flag

Implementation of flood bank set back measure

This option consists of the construction of a new clay embankment, 15 m to 30 m (setback) behind the existing “soke dike”, the ditch on the marsh side of the river bank, which traps saline water that soaks through from the river, preventing its spread across the reedbed. Source: BAM Nuttall. Case study: https://climate-adapt.eea.europa.eu/en/metadata/case-studies/regional-flood-management-by-combining-soft-and-hard-engineering-solutions-the-norfolk-broadlands

Implementation of flood bank set back measure
Size: 166 kB  —  Click to download full sized image
Language preference detected

Do you want to see the page translated into ?

Exclusion of liability
This translation is generated by eTranslation, a machine translation tool provided by the European Commission.

Exclusion of liability
This translation is generated by eTranslation, a machine translation tool provided by the European Commission.