After works

River Chet after BFAP Works (2009). This view demonstrates the scale of the works undertaken as part of the project. Whilst this may seem extreme in landscape terms the work is typically confined to a narrow 50 m corridor. In practice the scheme impacts on less than 3% of the project area it protects. Source: Broadland Flood Alleviation Project

After works
Size: 74.9 kB  —  Click to download full sized image
Language preference detected

Do you want to see the page translated into ?

Exclusion of liability
This translation is generated by eTranslation, a machine translation tool provided by the European Commission.