Exclusion of liability

This translation is generated by eTranslation, a machine translation tool provided by the European Commission.

Website experience degraded
The European Climate and Health Observatory is undergoing reconstruction until June 2024 to improve its performance. We apologise for any possible disturbance to the content and functionality of the platform.
Búsqueda avanzada de elementos en la base de datos de Climate-ADAPT aquí
6127 elementos que coinciden con sus términos de búsqueda
Filtrar los resultados.
Tipo de elemento



























Nuevos elementos desde



Ordenar por relevancia · fecha (primero los más nuevos) · alfabéticamente
Archivo PDF document Botanical Roof Garden
Located in Database / Case studies / Urban stormwater management in Augustenborg, Malmö
Archivo PDF document Adaptation strategy 2017-2019
Located in Database / Case studies / Implementing climate change allowances in drainage standards across the UK railway network
Imagen JPEG image Metro network
Map of the metro network of Copenhagen. Author and source: Metroselskabet
Located in Database / Case studies / Integrating adaptation in the design of the metro of Copenhagen
Archivo PDF document Annual report 2019
Located in Database / Case studies / Integrating adaptation in the design of the metro of Copenhagen
Archivo PDF document Brochure
Located in Database / Case studies / Isar-Plan – Water management plan and restoration of the Isar river, Munich (Germany)
Imagen PNG image Project map
The area of Kruibeke, Bazel and Rupelmonde polders, showing main interventions. Source: SIGMA Plan; https://www.sigmaplan.be/en/projects/polders-of-kruibeke/
Located in Database / Case studies / Kruibeke Bazel Rupelmonde (Belgium): a controlled flood area for flood safety and nature protection
Imagen PNG image The functioning of the Controlled Flood Area
During normal operation, high tides flow in through the weirs in the lowered outer dike; the water flows at low tide. Source: SIGMA Plan
Located in Database / Case studies / Kruibeke Bazel Rupelmonde (Belgium): a controlled flood area for flood safety and nature protection
Imagen JPEG image Reconnecting the former floodplain to the Danube at Mahmudia (Romania)
The key restoration work at Mahmudia was the breaching the dike to allow Danube water to re-establish the natural ecosystems on an agriculture polder at Mahmudia. Author: Cristian Mititelu; Source: WWF Romania
Located in Database / Case studies / Lower Danube green corridor: floodplain restoration for flood protection
Imagen PNG image The agriculture polder at Mahmudia 2 months after the end of the restoration project
The Danube waters flooded the restored area in 2 months. Author: Cristian Mititelu; Source: WWF Romania
Located in Database / Case studies / Lower Danube green corridor: floodplain restoration for flood protection
Imagen PNG image Before, during and after works
Before (2003), during (2006) and after (2019) works, in one of the compartments of the Broads. Source: Google Earth
Located in Database / Case studies / Regional flood management by combining soft and hard engineering solutions, the Norfolk Broadlands