Exclusion of liability

This translation is generated by eTranslation, a machine translation tool provided by the European Commission.

Website experience degraded
The European Climate and Health Observatory is undergoing reconstruction until June 2024 to improve its performance. We apologise for any possible disturbance to the content and functionality of the platform.
Ricerca avanzata nel database di Climate-ADAPT qui
6134 elementi soddisfano i criteri specificati
raffina_la_ricerca
Tipo di elemento



























Nuovi elementi da



ordina per rilevanza · Data (prima i più recenti) · alfabeticamente
File PDF document Botanical Roof Garden
text_searchitem_location Database / Case studies / Urban stormwater management in Augustenborg, Malmö
File PDF document Adaptation strategy 2017-2019
text_searchitem_location Database / Case studies / Implementing climate change allowances in drainage standards across the UK railway network
Immagine JPEG image Metro network
Map of the metro network of Copenhagen. Author and source: Metroselskabet
text_searchitem_location Database / Case studies / Integrating adaptation in the design of the metro of Copenhagen
File PDF document Annual report 2019
text_searchitem_location Database / Case studies / Integrating adaptation in the design of the metro of Copenhagen
File PDF document Brochure
text_searchitem_location Database / Case studies / Isar-Plan – Water management plan and restoration of the Isar river, Munich (Germany)
Immagine PNG image Project map
The area of Kruibeke, Bazel and Rupelmonde polders, showing main interventions. Source: SIGMA Plan; https://www.sigmaplan.be/en/projects/polders-of-kruibeke/
text_searchitem_location Database / Case studies / Kruibeke Bazel Rupelmonde (Belgium): a controlled flood area for flood safety and nature protection
Immagine PNG image The functioning of the Controlled Flood Area
During normal operation, high tides flow in through the weirs in the lowered outer dike; the water flows at low tide. Source: SIGMA Plan
text_searchitem_location Database / Case studies / Kruibeke Bazel Rupelmonde (Belgium): a controlled flood area for flood safety and nature protection
Immagine JPEG image Reconnecting the former floodplain to the Danube at Mahmudia (Romania)
The key restoration work at Mahmudia was the breaching the dike to allow Danube water to re-establish the natural ecosystems on an agriculture polder at Mahmudia. Author: Cristian Mititelu; Source: WWF Romania
text_searchitem_location Database / Case studies / Lower Danube green corridor: floodplain restoration for flood protection
Immagine PNG image The agriculture polder at Mahmudia 2 months after the end of the restoration project
The Danube waters flooded the restored area in 2 months. Author: Cristian Mititelu; Source: WWF Romania
text_searchitem_location Database / Case studies / Lower Danube green corridor: floodplain restoration for flood protection
Immagine PNG image Before, during and after works
Before (2003), during (2006) and after (2019) works, in one of the compartments of the Broads. Source: Google Earth
text_searchitem_location Database / Case studies / Regional flood management by combining soft and hard engineering solutions, the Norfolk Broadlands